Office Relocation Checklist for Delhi NCR Businesses

Plan an office move without losing working days: timeline, IT, building approvals and the move weekend.

  • 6 min read
  • Updated 12 October 2026
  • By the Daksh Packers team

8 to 12 weeks before

  • Appoint one move coordinator inside the company.
  • Get a floor plan of the new office and decide seating by team.
  • Ask two or three movers for a site survey and a written plan with costs.
  • Check both buildings' rules: allowed moving hours, service lift booking, loading bay access and insurance certificates they may require.

4 to 6 weeks before

  • Book the mover and fix the move window (usually a weekend).
  • Order internet and phone lines at the new office early; installation can take weeks.
  • Update your address with GST, bank, clients, vendors, Google Business Profile and the website.
  • Plan what to dispose of: old furniture, e-waste, files beyond retention period.

2 weeks before

  • Brief employees on packing their desks, the label system and the move date.
  • IT team takes full data backups and documents network and server setup.
  • Get gate passes and building approvals in writing.

Move weekend

  • IT disconnects equipment; the mover packs it in anti-static material.
  • Every desk, chair and carton carries a label matching the new floor plan.
  • Workstations are dismantled, moved and re-assembled; IT reconnects and tests.
  • Do a walk-through of the old office before handing it back.

First day in the new office

Have the move coordinator and IT on site early, keep a few spare cartons and tools handy, and collect a list of any missing or damaged items to sort out with the mover the same day. Planning an office move? See office relocation.